Operators work at the plant. The figures, and the right to approve them, sit on the manager's phone.
See the four layersThe Windows software opens the barrier, reads the scale, prints labels and logs every trip. But that stream of figures lives on one computer next to the gate: to know how the day is going, management has to phone the site or wait for an end-of-day summary. Synchronisation puts those same figures on a phone, without replacing the software already in use.
Each layer does exactly one job: equipment takes commands, the shop-floor machine controls and records on site, the server keeps the authoritative copy, the phone is for reading and approving.
Weighbridge, barrier, label printer, card reader, PLC. They take commands and report status back.
Operators drive the equipment from here, print documents and keep the local log. It keeps running when the connection drops.
Receives data, checks for duplicates, normalises it and applies permissions by unit and by role.
Managers read the figures, approve transactions and get alerted when a trip looks off.
Not every stream of data has to be instant. These are the targets VASCOM designs to, adjusted per plant and per device type.
Not a dashboard full of charts. The phone answers three questions: how much has moved today, what looks wrong, and what is waiting for the manager to approve.
Approving on the phone is an action with a trail: who approved, when, from which device.
Once plant data lands in one place, the AI has something to read. Its job is to point out what is worth looking at first, not to decide in place of management.
Same station, same product type: which shift ran below its usual pace, and at which step.
Gaps between the weight taken at the plant, the issue note and the invoice are flagged before anything is posted to the ledger.
Ask on the phone; the answer comes with the timestamp and the source record, one tap to open it.
A suggested list of items to check, each with a reason. The unit manager decides, within the permissions set.
The AI does not edit transactions, does not approve, does not delete data. Every change passes through a management approval gate.
Not necessarily. If the current software has a database that can be read, VASCOM writes a sync layer that reads from it. Only when the software is too old and has nowhere to read from does the equipment control layer have to be replaced.
No. The shop-floor machine keeps driving the equipment and recording locally; data goes into a queue. When the link returns, the queue pushes up in the order the events happened.
Every record carries a unique key generated by the plant machine. Pushing it again still yields one record, so a dropped connection mid-transfer does not create a second ticket.
According to the permissions already set: the right role, the right unit, the right limit. Staff without approval rights can still see the figures but do not see the approve button.
Tell VASCOM which software and equipment are in use. We look at how far that data can be read, then say plainly what can be synced straight away.